Vanilla shell vs white box comes down to how much of the interior the landlord has finished before you take the space. A grey shell is close to bare walls and an empty floor. A white box, which many brokers also call a vanilla shell, has finished perimeter walls, a ceiling, HVAC, basic lighting and a restroom. The terms are not standardized, so the lease exhibit, not the label, decides what you actually get.
That last point is where most build-out budgets go wrong. Two landlords can use the same words for very different spaces.
What is the difference between a grey shell, a white box and a vanilla shell?
Each term describes a level of completion. From least to most finished: cold or dark shell, grey shell or grey box, then white box or vanilla shell.
The City of Tampa's building department publishes one of the clearest public definitions. It describes a grey box as "empty spaces that have not been assigned a use classification with no work other than framed walls," and a white box as "a ready-to-lease space with no use classification assigned" [Source: City of Tampa 2023].
| Element | Shell building | Grey box | White box / vanilla shell |
|---|---|---|---|
| Interior walls | Bare block or studs; drywall allowed | Bare block or open framing; no drywall | Framed, insulated and drywalled |
| Ceiling | Not specified | None | Installed |
| HVAC | Shafts only, no ductwork | No ducts or controls | Equipment and ductwork installed |
| Electrical | Panels in the main electric room | Temporary life-safety lighting | Minor wiring provided |
| Plumbing and restroom | Water and waste stubbed to each floor | Not specified | Rough-in and a bathroom |
| Floor | Not specified | None or unfinished | Finished or sealed concrete |
Source: City of Tampa, Shell Building vs Grey Box vs White Box technical guide.
The same guide notes that definitions vary by municipality. Dallas, Fort Worth, Atlanta and Oklahoma City landlords all use these words, but none of them is bound to Tampa's version.
Vanilla shell vs white box: are they the same thing?
Usually, but not always. In most leasing conversations the two are used interchangeably for a space with finished walls, a ceiling and working base systems.
Some landlords use "vanilla shell" for something closer to a grey shell with HVAC added. Others mean a space with paint and lighting ready for fixtures. The Tampa guide's warning applies here too: the meaning shifts by market and by landlord [Source: City of Tampa 2023].
The safe assumption is that the label means nothing until the work letter lists each item. Ask for an exhibit that names the electrical service size, HVAC tonnage, restroom count, ceiling type and floor condition.
What does a tenant still have to build in a white box?
Almost everything that makes the space yours. A white box gives you a clean, code-ready envelope. It does not give you a store.
On a typical retail, restaurant or wellness finish-out, tenant scope still includes:
- Interior partitions, back-of-house rooms and doors
- Electrical distribution to fixtures, equipment and signage
- Plumbing beyond the base restroom: sinks, floor drains, grease interceptors, treatment rooms
- HVAC distribution and any added tonnage for kitchens or high occupancy
- Finishes: flooring, wall finishes, ceilings in sales areas
- Millwork, fixtures and brand elements
- Fire sprinkler modifications and alarm devices for the new layout
Much of that scope is metals-heavy. Input prices for nonresidential construction rose 11.9 percent from September 2025 to September 2026, with copper and brass mill shapes up 30.0 percent [Source: AGC 2026]. Every circuit and pipe the landlord does not deliver is now a bigger tenant cost.
Which delivery condition costs the tenant more?
A grey shell almost always costs the tenant more in construction, and a white box usually costs more in rent. The real question is who carries which part, and whether the tenant improvement allowance closes the gap.
| Delivery condition | Tenant construction scope | Typical trade-off |
|---|---|---|
| Cold or dark shell | Largest: base systems plus full finish-out | Longest schedule; often paired with a larger allowance |
| Grey shell / grey box | Walls, ceiling, HVAC distribution, restrooms, finishes | More control over layout; more tenant cost |
| White box / vanilla shell | Layout, MEP distribution, finishes, fixtures | Faster start; less flexibility on base systems |
| Second-generation space | Demolition plus modification of a prior tenant's build-out | Can be fastest, or hide the most surprises |
Market conditions affect the leverage. Commercial construction spending ran 4.0 percent below a year earlier in September 2026 [Source: U.S. Census Bureau 2026]. In a softer market, tenants can often negotiate a higher delivery condition or a larger allowance. How allowances work is covered in who pays for a commercial finish-out.
What should a tenant check before signing for a white box space?
Verify the base systems against your prototype, not against the listing. The gaps that cause change orders are almost always in power, HVAC and plumbing.
- Electrical service. Amperage and voltage at the panel. Restaurants, wellness and automotive uses often need more than the landlord delivers.
- HVAC capacity. Tonnage and condition of the rooftop units. Kitchens and treatment rooms add load.
- Plumbing locations. Where waste lines run under the slab. Moving them means trenching.
- Fire sprinkler system. Head layout for an open box rarely suits a partitioned space.
- Accessibility. Whether the restroom and entry meet current code for your use.
- Use classification. The Tampa guide notes a white box has no use classification assigned [Source: City of Tampa 2023]. Your permit sets it, and that can trigger code upgrades.
A contractor site walk before the lease is signed is the cheapest insurance a tenant can buy. More on reading the lease in how the delivery condition decides your scope before day one.
How ASEL10 helps tenants read a delivery condition
ASEL10 builds tenant finish-outs for franchise and corporate brands in Dallas-Fort Worth, Atlanta and Oklahoma City. We walk shell, grey box and white box spaces against the brand's prototype before scope is priced, so the gap between what the lease says and what the building has shows up on paper, not mid-project.
- Restaurants, where power, gas and grease drive scope.
- Wellness spaces, where treatment-room plumbing and privacy add work. See wellness build-out requirements room by room.
- Automotive service centers, where bays, lifts and drainage rarely fit a standard box.
- Multi-location rollouts where the same check runs at every site.
Frequently asked questions
What is a warm shell?
A warm shell is a loose term for a shell space with some base systems in place, usually HVAC and basic electrical, but not the full finish of a white box. Like the other terms, it is not standardized. Some landlords use it to mean nearly the same as a grey shell with heat and air, while others mean something close to a white box. Always ask for a written list of what is included rather than relying on the label in a listing or a broker's email.
Is a vanilla shell move-in ready?
No. A vanilla shell or white box is ready for the tenant's build-out, not ready for business. It typically has finished walls, a ceiling, HVAC, basic lighting and a restroom, but no layout, fixtures, equipment or brand finishes. A tenant still needs permits, construction and inspections before opening. For food service, wellness or automotive uses, the scope can still be substantial because those uses add power, plumbing and ventilation.
Who pays to bring a grey shell up to a white box?
That is decided in the lease. Sometimes the landlord completes the base work before delivery. Sometimes the tenant does it and is reimbursed through a tenant improvement allowance. Sometimes the tenant pays and negotiates lower rent instead. The key is that the work letter spells out each item, who builds it, who pays and when the space is considered delivered, because that date often starts the rent clock.
Can I change the HVAC or electrical in a white box?
Usually, with landlord approval and permits. Many tenants need more capacity than a white box delivers. Upgrades to electrical service, added rooftop units or new gas lines are common on restaurant and wellness projects. They take time because utility coordination and equipment lead times are involved, so they should be identified before the lease is signed, not after construction starts.
The short version
Vanilla shell vs white box vs grey shell is a question about who builds what before you move in. The labels are not standard. Get the delivery condition itemized in the lease, walk the space against your prototype, and price the gap before you sign.