Commercial construction change orders are the main reason a build-out finishes over budget. Each one adds cost, and most trace back to three causes: drawings that were not finished, conditions nobody checked, and decisions that changed after the work started. A few are unavoidable. Most can be prevented before the contract is signed, and the rest can be priced and approved fast enough that they do not stall the job.
Budget overruns rarely come from one bad bid. They come from twenty small changes nobody totaled until the end.
How much do commercial construction change orders add to a project?
More than most budgets allow for. Research from AIA Contract Documents found the average cost change on building projects ranges from about 3.2 to 5.0 percent depending on project size. On lower-value buildings the spread ran from minus 8.02 to plus 15.88 percent [Source: AIA Contract Documents].
| Project value | Average change orders per project |
|---|---|
| Under $500K | 1.70 |
| Over $50M | 11.29 |
Source: AIA Contract Documents, The Truth About Change Orders.
The same research found 38.24 percent of completed projects had only one change order over their life. So a clean project is possible. It is just not the default.
The wide spread on smaller projects matters for tenant finish-outs and remodels. A few percent swing on a single store is a few percent less margin on the first year of operation.
What causes change orders on a tenant finish-out?
Mostly things that were knowable before construction. The AIA research lists unexpected site issues, changes in products and materials, and changes in project requirements such as scope changes and updated owner requirements [Source: AIA Contract Documents].
On commercial interiors those show up in familiar ways:
| Cause | Typical example | Preventable? |
|---|---|---|
| Existing conditions | Undersized electrical service, slab that needs trenching, old ductwork that cannot be reused | Mostly, with a site survey before bid |
| Incomplete drawings | Fixture plan not final, equipment specs missing | Yes |
| Owner or brand changes | New prototype revision issued mid-project | Partly, with a design freeze date |
| Code or plan review comments | Added fire rating, accessibility revision | Partly, with early code review |
| Product substitutions | Specified item unavailable or long-lead | Partly, with early procurement |
The landlord's delivery condition is a frequent hidden cause. If the lease promised a space that does not exist on site, the gap becomes a change order. See how the delivery condition decides your scope.
Why are change orders more expensive in 2026?
Because the materials inside them cost more than they did a year ago, and financing every extra week costs more too.
Input prices for nonresidential construction rose 11.9 percent from September 2025 to September 2026. Steel mill products rose 27.6 percent and copper and brass mill shapes rose 30.0 percent [Source: AGC 2026]. Most change orders on a finish-out touch electrical, plumbing or framing, which is exactly where those metals sit.
Interest adds a second layer. The Federal Reserve held its target range at 3-3/4 to 4 percent in October 2026 [Source: Federal Reserve 2026]. A change order that adds a week also adds a week of carry. More on that in how interest rates are reshaping commercial construction.
How do you prevent change orders before construction starts?
By spending a little more time before the contract, so there is less to discover after it.
- Survey the existing space. Verify electrical capacity, plumbing locations, HVAC condition and slab before pricing.
- Freeze the design. Set a date after which brand or owner changes are priced as changes, not absorbed.
- Finish the equipment schedule. Kitchen, cooler and specialty equipment drive power and plumbing. Missing specs become change orders.
- Run an early code review. Plan review comments that add scope are cheaper to absorb on paper.
- Order long-lead items at award. Substitutions happen when items are ordered late.
The AIA data shows why timing matters. Large buildings averaged about one change order in the first 10 percent of the project, rising to about 15 by the 90 percent mark [Source: AIA Contract Documents]. Changes pile up late, when they cost the most to absorb.
How should change orders be priced and approved?
Fast and in writing. A change order that sits unapproved for two weeks costs the cost of the change plus the cost of the wait.
A clean process looks like this:
- Field identifies the issue and documents it with photos.
- The contractor prices it with a scope, a cost breakdown and a schedule impact.
- The owner or brand approves, rejects or asks for options within an agreed number of days.
- The approved change is logged against the budget and the schedule is updated.
Schedule impact is the line owners most often skip. The AIA research found average duration growth of roughly 1.07 to 1.13 percent across project sizes [Source: AIA Contract Documents]. Small per change, but it adds up across a program.
Tracking every change against the original budget, in one place, is what stops twenty small changes from becoming one large surprise. It also shows where the next store's drawings need to change.
How are change orders different on a multi-location rollout?
On a rollout, a change order at one site is a warning for every site after it.
If store two needs an electrical service upgrade, the question is whether store five, eight and twelve will too. If a prototype detail fails in the field, fixing it in the drawings saves the same change order across the rest of the program. Research on rework estimated it cost the U.S. industry more than $31 billion in 2018, largely from poor communication and bad project data [Source: PlanGrid and FMI 2018]. Rollouts multiply that problem or solve it.
Questions to ask before awarding a program are in how to choose a commercial contractor for a franchise rollout.
How ASEL10 keeps change orders under control
ASEL10 builds for franchise and corporate brands across Dallas-Fort Worth, Atlanta and Oklahoma City. Owner-led delivery means one accountable team from pricing to closeout, so changes are caught, priced and logged by the people running the work.
- Tenant finish-outs with existing-condition surveys before pricing.
- Commercial remodels where hidden conditions are expected and planned for.
- Multi-location rollouts where one site's lessons reach the next.
- Project management with a single change log against the budget.
- Vertical experience in convenience stores, wellness and retail franchise spaces.
Frequently asked questions
What is a normal contingency for a commercial finish-out?
There is no single right number, and it depends on how complete the drawings are and how much is known about the existing space. AIA research found average cost changes of about 3.2 to 5.0 percent across building projects, with a much wider spread on smaller ones. A space that has been surveyed, with finished drawings and a design freeze, can carry less contingency than one bid off a lease plan. Ask your contractor what they found on the site walk before settling the number.
Who pays for a change order?
It depends on the cause and the contract. Owner-requested changes are normally paid by the owner. Conditions the landlord was obligated to deliver may be the landlord's cost under the lease. Errors in the contractor's own work are the contractor's to fix. That is why the cause of each change should be written on it. On a finish-out, the lease, the construction contract and the drawings together decide who carries each one.
Can a contractor refuse to do work without a change order?
Many contracts allow it, and it is usually in everyone's interest to document the change before the work happens. Some contracts include a process for directed changes, where the owner orders the work to proceed and the price is settled after. That keeps the schedule moving. What matters is that the scope, cost and time impact are written down and agreed, not left to memory at the end.
Do change orders always mean the contractor bid too low?
No. Most change orders come from scope changes, existing conditions or product issues, according to AIA research. A low bid that excludes obvious scope can lead to change orders, which is why comparing bids line by line matters. But a project with changes is not automatically a badly bid project. What matters is whether the changes were preventable and how fast they were priced and approved.
The short version
Commercial construction change orders are where budgets break. Survey the space, finish the drawings, freeze the design, order long-lead items early, and approve changes in days, not weeks. In a year when metals and money both cost more, every change order that does not happen is margin kept.